How a stone slab panel gets set, from crane to joint
A crane takes the panel up the facade and two workers walk it through the stair void. Layout comes next: tape and level on the opening, laser line and spacers for the plane. The panel is dry fitted, the cut edge polished, then set on a mortar bed with suction cups. Stair treads and the floor field follow the same order, and the joints are wiped down last.